Cost: $130,000
Location: Spring Lake MI
Age Group: 5-12
Spring Lake Public Schools was in desperate need of a fresh start on their playground. Removing the entire old playground gave them a fresh start to do something new. GLRC was asked to use our expertise in design service to come up with a new playground that would last another 30 plus years. This playground is packed with fun and exciting play events. Multiple independent items help break up the congestion of the deck and posts structures. Deck and post structures are spilt into 2 different sections but joined with a giant 6′ spinning wheel that branches the structures together! Spinning station with 4 different spinners, multiple swings, basket swing for a load of friends, see saw snake for multiple friends, rock and ride, stand up spinners, this isn’t the ordinary playground.